澳门威斯尼斯人app(中國)官方網站·Mobile ENT APP

Enter keywords to search

Close
Close

Background information and customer requirements

Longi Green Energy Xianyang Branch's Wastewater Treatment Plant Project

The sewage treatment plant mainly serves the production wastewater of Longi Green Energy Xianyang Branch's annual production of 15GW high-efficiency single crystal battery project and other industrial enterprise drainage. The total design capacity is 60000 tons/day, of which the drainage of Xianyang Branch of Longi Green Energy is 45000 m3/d, accounting for 75% of the total water volume.

Solution

TAfter on-site investigation and in-depth technical exchange with the design institute and the technical personnel of China 17th Metallurgical Group Co., Ltd., the sewage treatment plant in Jinghe New Town Industrial Ghetto, Jingyang County, Xianyang, Shanxi Province has determined to adopt three sets of 40kg/h ozone systems of Guolin ozone process.

Ask Experts

Customer
Service

400-653-2616

  • Customer Service Center

    400-653-2616

  • 7×24 year-round service

    2 hours response, 24 hours at the scene.(In China mainland)

  • Active intelligent service

    Complete customer profiles providing proactive services

  • Expert considerate service

    We have long-term cooperation with experts of ozone technology.

  • Upgrade

    Cooperate with client to upgrade relevant equipment in the ozone generation system.

回到顶部
XML 地图